General
The Kerite Company Joins The Marmon Group - September 22, 1999

Product/Applications
Wyoming Project Features Wind Power
The Kerite Alternative to PILC: Safe, Easy, Reliable EP Insulation
Every Circuit Is Critical - Only Kerite cuts PILC costs 50 per cent
Installing Submarine Power Cable in Enviromentally-sensitive SW Florida
Installing Submarine Cables in the Great Lakes
PP&L Chooses Kerite Cable
Can You Spot the Transmission Line?
Experience with Aerial Cable

Why Select/Specify Kerite?
Accelerated Cable Testing - Is there value in it?
Accelerated Cable Testing - Beware of misleading data
Importance of Discharge Resistance
Total Cost Evaluation

 


  Copyright © 2001 Innovative Systems Inc. All rights reserved. Disclaimer/Legal