Kerite helps High Point, NC with a turnkey HV cable solution

Author: Kerite/Tuesday, March 31, 2015/Categories: Case Study

The city of High Point, North Carolina, needed two short-length transmission circuits installed. Challenge:  High voltage aerial transmission lines were in the congested substation area. Solution:  Underground transmission by Kerite.

The city chose to work with Kerite not only for quality HV Cable, but for engineering, design, and project management.

The project required less than 5,000 feet of 115kV cable. But shorter installations come at a high price. Kerite saved money by delivering the exact length of cable required. The project was brought to completion with significant savings.

The message: Count on Kerite for end to end value.